Back to Portfolio
Backend Golang Developer September 2020

Scafol - Digital Construction Project Management

A web platform for recording and monitoring construction projects, from financial reports, material needs, and worker data to construction progress.

Client
PT Aplikasi Konstruksi Global
Role
Backend Golang Developer
Duration
4 Months
Team
5 Developers
Completed
September 2020
Challenge

Construction reports used to be written by hand and scattered around, so it was hard to know the real state of a project. Contractors needed one place to submit reports and check progress without waiting for a recap.

Solution

Built a centralized application that can be opened from a computer or a phone, with APIs connecting project, material, worker, and progress data entered by contractors.

Project Overview

On this project I worked on the backend: building APIs based on the database structure from the System Analyst and the existing Figma prototypes. The work covered data processing and the logic behind each endpoint.

I also coordinated with the other teams during testing and bug fixing, so each part stayed in line with the plan.

What I worked on

Construction project reports hold many kinds of content: finance, materials, workers, and progress. Each one is filled in by a different person, so I split the endpoints by need while keeping them tied to the same project.

A few things I handled:

  1. Project data as the anchor. Every report has to attach to the right project. Only from there can the finance, material, worker, and progress reports be linked.
  2. Reports filled in stages. People on site do not always have time to fill everything at once, so a report can be saved partially and completed later.
  3. Summaries for monitoring. Data from several reports is combined so a contractor can see the state of a project without opening each one.
  4. Different access per role. Not everyone needs to see financial reports, for example. I enforced access limits on the API side, not only in the interface.

Things worth noting

Construction project data does not arrive neatly. Some reports come in late, some numbers are corrected afterwards, and some projects run at the same time. Because of that, I spent a lot of effort making sure a change in one report did not break the summaries that already existed.

Another thing I learned here was working from design documents. Since the database structure and the screens were prepared by other people, my job was to keep the data underneath consistent with what was promised to the other teams.

The result

Contractors can submit and monitor project reports from a single application, including from a phone while on site. For me, this project was the first time working from a workflow designed up front, and from it I learned to appreciate how much a clear data structure matters before writing code.